NEWS
Gather the company's real-time dynamics and release Haitong's fresh information
Position:
Homepage
/
/
/
Two 8000-ton oil barges started simultaneously

Two 8000-ton oil barges started simultaneously

  • Categories:Notice
  • Author:
  • Origin:
  • Time of issue:2019-09-04
  • Views:3

(Summary description)On September 3, the signing ceremony of the two 8000-ton oil barge construction projects built by Jiangsu Haitong Marine Engineering Equipment Co., Ltd. was held simultaneously. Representatives of shipowners, classification societies and company leaders attended the ceremony. It is reported that the ship has a total length of 96.288m, a width of 27.432m, a depth of 6.400m, a design draught of 4.300m and a BV classification.

Two 8000-ton oil barges started simultaneously

(Summary description)On September 3, the signing ceremony of the two 8000-ton oil barge construction projects built by Jiangsu Haitong Marine Engineering Equipment Co., Ltd. was held simultaneously. Representatives of shipowners, classification societies and company leaders attended the ceremony. It is reported that the ship has a total length of 96.288m, a width of 27.432m, a depth of 6.400m, a design draught of 4.300m and a BV classification.

  • Categories:Notice
  • Author:
  • Origin:
  • Time of issue:2019-09-04
  • Views:3
Information

On September 3, the signing ceremony of the two 8000-ton oil barge construction projects built by Jiangsu Haitong Marine Engineering Equipment Co., Ltd. was held simultaneously. Representatives of shipowners, classification societies and company leaders attended the ceremony. It is reported that the ship has a total length of 96.288m, a width of 27.432m, a depth of 6.400m, a design draught of 4.300m and a BV classification.

Scan the QR code to read on your phone

Copyright © 2020 Jiangsu Haitong Offshore Engineering Equipment Co., Ltd.   苏ICP备12067388号-1